Agenda


08:00 AM  -  08:30 AM
Registration & Tea Break
Location: Venue

Registration & Tea Break

08:30 AM  -  10:00 AM
Site Visit - Welcome and Safety Meeting
Location: Rosebank

Join us for an exclusive tour . The site visit will take us through the life cycle of prefab construction. We will explore the materials used, casting beds, wood shop the production line, the engineering and finishing area, and the use of BIM and other systems that tie together design, architecture, construction, and finally delivery. Join us for this immersive experience that will set the stage for the two hands-on workshops in the afternoon.

Break into smaller tour groups

10:30 AM  -  03:00 PM
Leave For Next Site Visit : Fourways-Modular Hotel
Location: Fourways-Modular Hotel

Site Tour

12:00 PM  -  01:00 PM
Lunch
Location: Crowne Plaza Venue

Lunch and Networking

01:00 PM  -  02:30 PM
Transformation from paper to 3D to BIM and beyond
Location: Venue

Building more accurately and efficiently requires higher levels of development in your design models. This session will provide examples on challenges and opportunities of moving your models into the future
• Learn from an industry leader on how they serve their clients through integrating design, and construction
• Leverage interoperable technology applications, including, Building Information Modelling (BIM)
• Move your team and systems from outmoded models to higher efficiency

02:30 PM  -  04:30 PM
Mini workshop: Introduction to BIM and BIM Implementation
Location: Venue

Offsite construction requires great foresight and planning, and the integration of design, architecture and construction at the early stages of project planning, and implementation. Integrating technology into your processes and workflow is an important piece of the puzzle. Learn how to effectively integrate BIM at the project, people, and systems level

08:00 AM  -  08:30 AM
Registration and Coffee
Location: Venue

What can we learn by looking beyond how we’ve always done it?

08:30 AM  -  09:25 AM
Container & POD Modular Construction in South Africa

IMC Container Homes are constructed in South Africa from shipping containers. Designed to stand the test of time they are solid, safe, transportable and incredibly durable; being fire, earthquake and hurricane resistant. IMC can supply single storey up to high rise buildings. They also assist from design to installation including local authority approvals. Houses are delivered ready to plug and play. Construction including delivery and final hand over can take from 1-8 weeks (depends on project scope).In this session we look at how IMC was conceived and how Western Cape has benefited from this endeavour.

09:25 AM  -  10:15 AM
Using Lean and Prefab Construction to Reduce Material Waste and Increase Energy Efficiency
Location: Venue

Designing sustainably requires foresight and planning from early stages of project design. Building in energy efficient manner and reducing waste will be required to maintain the level of construction and need for infrastructure. What can we learn from lean construction methodologies for the green building revolution?
• Learn about how Green Star and prefab construction can promote occupant wellbeing, reduce waste, and create sustainable and long-term impact
• Discover how you can measure your ROI through sustainable building and construction
• Find out how to integrate sustainable design with lean design methodologies

10:15 AM  -  10:30 AM
Coffee Break and Networking
Location: Venue

How can we deliver greater value to our clients?

10:45 AM
The Evolution of 3D Concrete Printing
Location: Venue

The Evolution of 3D Concrete Printing

11:15 AM  -  12:00 PM
Real Challenges on Modularisation: Research meets Reality
Location: Venue

Real Challenges on Modularisation: Research meets Reality
Recent efforts through research have provided the theory and background behind the move to modularisation in this industry, including preliminary tools for implementation. Do the research and tools support reality and, what can you as individual companies do to be “up to speed? Without going through a potential “painful” learning process.

12:00 PM  -  12:45 PM
Developing Modular Hotel Rooms Balancing Project Efficiency with the Environmental and Human Impact
Location: Venue

Balancing Project Efficiency with the Environmental and Human Impact
Building and refurbishing in hospitality is a complex undertaking, and requires consideration for both project efficiency, and customer-oriented project management.

02:00 PM  -  02:30 PM
Demonstration/Presentation by Abacus Space Solutions (Modular Buildings)
Location: Venue

Demonstration/Presentation by Abacus Space Solutions (Modular Buildings)

02:30 PM  -  03:15 PM
SMART Modular Homes
Location: Venue

SMART Modular Homes

03:15 PM  -  04:30 PM
Commercial Modular Solutions
Location: Venue

Commercial Modular Solutions
• Site Offices
• Reefers
• Storage
• Mobile Clinics
• Education
• Staff Housing

This site was built using